Generoso Bridge 1 ( old bankerohan bridge)

Philippines
April 21, 2007 11:59pm CST
To the visiting public or to anyone who wants to visit davao this summer, here is a little news for you. The Generoso Bridge 1 or the old bankerohan bridge is impassable due to the damages it incurred for being old. The projected construction of a new bridge is 6 months but the start of project has not been announced yet. The reported 300million pesos for the construction of the new bridge is either approved or still pending. With these little problem, expect high traffic in the bankerohan-sandawa area and also the bankerohan-quirino area. ALternate routes is the bolton bridge and the diversion bridge, but if your a private vehicle you can also pass through marfori heights and take the DIHO-Gem village bridge and will take you directly to ma-a highway. Happy visiting Davao..
2 responses
@pfortun (26)
• Philippines
2 May 07
Thanks for this information. Ill be there next week
• Philippines
8 May 07
your welcome...
• Malaysia
22 Apr 07
I never been to Davao. If I have money and ample time, I want to visit this place. I think Davao is one of the lovely and nicest place here in our country. If ever i'll visit this place, will you be able to tour me? aheheh
• Philippines
23 Apr 07
a tour..Hmmnn..will see..but what I can certainly give you is a tour guide info..where to book a hotel, where to eat with budget, and where to go info.. :)