This is the latest update of our problematic bridge

@cacay1 (83505)
Cagayan De Oro, Philippines
March 29, 2017 7:37am CST
This day I took a picture of our bridge still under renovation. It seems no end. Though it is summer here but we cannot evade the earth to send rains. This day, it rains and if this rain continues, I am afraid I have to wake up at 3 dawn to prepare everything including my food so I can escape walking in mud. I commute when it rains.It is better than driving in a very risky road. The construction builders of this are given ultimatum by the president of the Ph. and this road must be done in there years from now, or else, they have to hide in the rainbow. Thank you for reading. Image taken by me personally
9 people like this
11 responses
@Allan12 (86)
29 Mar 17
thats sad i hope that bridge will be done asap its a very big hassle for you.guys there :(
2 people like this
@cacay1 (83505)
• Cagayan De Oro, Philippines
29 Mar 17
Sorry the photo did not appear internet so slow. I may re-try.Thank you,.
1 person likes this
29 Mar 17
@cacay1 thats okay the topic explains everything stay safe!
1 person likes this
@cacay1 (83505)
• Cagayan De Oro, Philippines
29 Mar 17
@Allan12 Thanks.
1 person likes this
@magallon (19279)
• Philippines
29 Mar 17
Is the DPWH in charge of the construction?
2 people like this
@cacay1 (83505)
• Cagayan De Oro, Philippines
29 Mar 17
Yeah and the city officials,
1 person likes this
@magallon (19279)
• Philippines
30 Mar 17
@cacay1 No wonder... DPWH is one of the most corrupt government agencies .
@Shavkat (139962)
• Philippines
29 Mar 17
Oh dear! This should be accomplished before wet season.
1 person likes this
@Shavkat (139962)
• Philippines
29 Mar 17
@cacay1 Are you back in the Philippines?
1 person likes this
@cacay1 (83505)
• Cagayan De Oro, Philippines
29 Mar 17
@Shavkat , That is true or else, OMG I might walk in mud again.
2 people like this
@cacay1 (83505)
• Cagayan De Oro, Philippines
30 Mar 17
@Shavkat hahaha you are funny friend I been here na since October to teach or report to work.
1 person likes this
@epiffanie (11326)
• Australia
2 Apr 17
It's always like that in the Philippines .. But I hope they take the President's words seriously ..
1 person likes this
@cacay1 (83505)
• Cagayan De Oro, Philippines
2 Apr 17
@epiffanie , That is true and we observe they are having their over time 24/7 last chance or else they will land in jail.
1 person likes this
@ridingbet (66854)
• Philippines
30 Mar 17
i guess it will take a longer period of time for the bridge o be finished and operational.
1 person likes this
@cacay1 (83505)
• Cagayan De Oro, Philippines
31 Mar 17
@ridingbet no single vehicle to cross id road wet and slippery. This builder is so corrupt.
1 person likes this
@cacay1 (83505)
• Cagayan De Oro, Philippines
30 Mar 17
@ridingbet , That is true we feel it too, we may suffer many times walking during rainy months.
1 person likes this
@ridingbet (66854)
• Philippines
30 Mar 17
@cacay1 but the agency should rush finishing that bridge because not only the ordinary people suffer the consequences, but even the students. they (students) might get lazy going to school because of the long distance walk they have to endure.
1 person likes this
@sunrisefan (28524)
• Philippines
29 Mar 17
If they hide in the rainbow, they will have the pot of gold hehehe!
1 person likes this
@cacay1 (83505)
• Cagayan De Oro, Philippines
30 Mar 17
@sunrisefan , and so they will be lucky there hahaha.
1 person likes this
@cacay1 (83505)
• Cagayan De Oro, Philippines
31 Mar 17
1 person likes this
@sunrisefan (28524)
• Philippines
30 Mar 17
1 person likes this
@youless (112507)
• Guangzhou, China
31 Mar 17
I hope this bridge will be finished soon. I think they also think about building another bridge somewhere as the backup. There is a river in my city and it separates our city into two parts. Long time ago we just had one bridge and the traffic was terrible. Now we have more bridges and it doesn't matter where you live and work.
1 person likes this
@cacay1 (83505)
• Cagayan De Oro, Philippines
31 Mar 17
@youless , we hope so , if not we will surely keep on walking in crossing this undone bridge for it gets slippery during rainy days.We also have here Carmen bridge that connects divisoria and Carmen where markets are located.
1 person likes this
@jaboUK (64354)
• United Kingdom
29 Mar 17
I hope you don't have to wade through the mud. That seems an awfully long time to take to finish the job.
1 person likes this
@cacay1 (83505)
• Cagayan De Oro, Philippines
30 Mar 17
@jaboUK, I did walk in mud this morning with my knee level boots hehehe, then this afternoon weather shifted to a hot afternoon sun shines so brightly. I may not walk in mud when I go home home. I have to leave the faculty office after sending you this reply to avoid traffic problem in road. Thanks.
1 person likes this
@garymarsh6 (23405)
• United Kingdom
30 Mar 17
OH dear there is nothing worse than walking in the rain and mud especially if there are cars passing you they will soak you!
1 person likes this
@cacay1 (83505)
• Cagayan De Oro, Philippines
30 Mar 17
@garymarsh6, No vehicles to pass very muddy and slippery , one should reach the opposite to catch up the ride there. In between roads are planted with soil, not yet concretized , so muddy and slippery.
@TheHorse (218933)
• Walnut Creek, California
29 Mar 17
Three years? That seems like along time! How quickly could it be done if all the right people were bribed?
1 person likes this
@cacay1 (83505)
• Cagayan De Oro, Philippines
30 Mar 17
@TheHorse , actually these 3 years are the extension years for this renovation of bridge almost reached 7 years now ,plus the 3 years, oh my Lord.We hope here the corrupt UKC builders will wake up if not soon they will land in jail.
@Courtlynn (67083)
• United States
29 Mar 17
There is no image..
1 person likes this
@cacay1 (83505)
• Cagayan De Oro, Philippines
29 Mar 17
@Courtlynn , Awhile ago I edited to have the image appears, it does now, thanks to Mylot.